under Construction
Process Comparing Table
|
Slab Performing |
Performing Stages |
|||||||||
|
Steel |
Secondary Beams |
Steel |
Shear |
Minimum |
Concreting |
|||||
|
Common |
Secondary Beams |
Shuttering |
Regulation and |
Shear |
Rebar |
Concreting |
Removing the Shuttering |
|||
|
Joist and |
Joist placing |
Block placing |
Pilling |
Armature |
Concreting |
Pile |
||||
|
Post-tensioned |
Pilling |
Shuttering |
Regulation and |
Minimum |
Case Placing |
Passing Strand |
Concreting |
Strand |
Removing Pile |
|
|
Reinforced |
Pilling |
Shuttering |
Regulation and |
Rebar |
Concreting |
Removing pile and |
||||
Maximum free space between secondary beams
(Without pile)
|
AP-OM |
AP-CM |
AP-DT |
|||
|
Maximum |
With minimum |
4.15 m |
3.75 m |
4.0 m |
|
|
With maximum |
3.45m |
3.0 m |
3.25 m |
||
Maximum free space between secondary beams
(With pile)
|
AP-OM |
AP-CM |
AP-DT |
|||
|
Maximum |
With minimum |
5.05 m |
5.25 m |
5.25 m |
|
|
With maximum |
7.05 m |
7.35 m |
7.30 m |
||
Concrete saving and dead load decrease in comparison to concrete slab
|
Decrease in |
Decrease in |
||
|
AP-OM |
25% |
65 |
|
|
AP-CM |
17% |
45 |
|
|
AP-DT |
7% |
20 |
|
